AFJ Instruments LT32C/10 Manuale operativo - Pagina 16

Sfoglia online o scarica il pdf Manuale operativo per Hardware di rete AFJ Instruments LT32C/10. AFJ Instruments LT32C/10 18. Artificial mains network (lisn)

SECTION E: SWITCHING OPERATION
E.1 • GENERAL
Switching operations are defined in CISPR 14-1 as EUT supply current change; no other specifications
are reported.
AFJ LISN LT32C/10 offers current meter to read and measure Switching Operations and EUT
absorption current, as per CISPR 14-1 requirements.
Example of appliances for which the click rate N is derived from the number of switching operations:
- Thermostats for room heating equipment;
- Refrigerators;
- Freezers;
- Cooking with automatics plates;
- Appliances with one or more boiling plates controlled by thermostats;
- Irons;
- Sewing machine speed controls;
- Electro mechanical officer machines;
- Slide projector picture change device.
SECTION F: LT32C/10 LINE IMPEDANCE VERIFICATION PROCEDURE
F.1 • LINE IMPEDANCE MEASUREMENT
Test Equipment:
Network analyzer (f = 9kHz ÷ 30MHz)
AFJ LISN LT32C/10
50Ω BNC dummy load
SCHUKO to BNC adapter
Operations:
1. Switch the Network analyzer ON and wait for warming up enough according to the user manual;
2. Switch the LISN ON;
3. check that the Earth Floating LED is OFF;
4. connect the 50Ω dummy load to the BNC RF output of the LISN;
5. connect the network analyzer output port to the SCHUKO plug by means of the relevant adapter;
6. set the network analyzer for impedance measurement at the output port with the following
parameters:
a) Start Freq.:
b) Stop Freq.:
c) IFBW:
d) Power:
AFJ LT32C/10 LISN - Operating Manual - rev. 3.8 / 2019-01
10kHz
30MHz
300Hz
-10dBm
3311 Lewis Ave, Signal Hill CA 90755,
408-916-5750, www.reliantemc.com
Distributed by:
Reliant EMC LLC
16