Dynavision D2 Manuale di montaggio - Pagina 2
Sfoglia online o scarica il pdf Manuale di montaggio per Cremagliere e cavalletti Dynavision D2. Dynavision D2 3.
1. Unpack the D2 stand from skid, wheel to desired
mounting location. Desired area shall have a level
floor and close to an AC source. Set leveling casters
to level and stabilize rack (wheels off the floor).
2. Assemble the D2 according to the instructions
provided. Place the D2 close to the rack, laying
down as shown.
Units shall be placed where there is available access to an electrical outlet.
Refer to the Dynavision D2 assembly instructions for assembly and operation details
3. Open both rear panels with the keys supplied.
Connect the rack to an AC source. Raise the
rack to its maximum height.
4. Lift the D2 upright and place the D2 onto the
stand as shown. Holding on to the D2, connect
the the D2 to an AC source. Raise the unit to
expose the first mounting panel – next page.
To accomplish this step safely, you must employ 2 people to do the job.
An AC source is required in order to perform these instructions (units plugged in).
Refer to the Dynavision D2 assembly instructions for assembly and operation details