Galvin Engineering CliniMix WM-PMSKIT Installazione del prodotto Manualline - Pagina 3

Sfoglia online o scarica il pdf Installazione del prodotto Manualline per Prodotto idraulico Galvin Engineering CliniMix WM-PMSKIT. Galvin Engineering CliniMix WM-PMSKIT 6. Inwall shower disinfection kit

Galvin Engineering CliniMix WM-PMSKIT Installazione del prodotto Manualline
3. Remove handle assembly
 Unscrew the tamper proof screw from the handle.
Pull out handle assembly from the body.
5. Isolate shower
To isolate the shower:
 Remove wire clips.
 Using a hex key, turn the isolators in an anti-
clockwise direction until fully removed.
Version 1, 22 October 2019, Page 3 of 6
4. Remove faceplate and flange
Unscrew the three screws and pull out the flange and
faceplate from the unit.
6. Turn on Cold water
Temporarily fit the handle to the cartridge.
Turn handle clockwise until it stops.
Turn handle anti-clockwise 45⁰ (1/8
the cold side of the mixing valve allowing hot water to
flow through it.
Remove the handle without rotating.
th
turn) to open