GREEN TOILET 120 Family Manuale di istruzioni per il montaggio e l'uso - Pagina 6
Sfoglia online o scarica il pdf Manuale di istruzioni per il montaggio e l'uso per Servizi igienici GREEN TOILET 120 Family. GREEN TOILET 120 Family 12.
The openings for the seat tend to vary in outhouses – there is no standard. Usually this is
not a problem when assembling the Green Toilet. Just level the thermal seat, the opening
of the seat and the waste pipe in the front of the seat. Thus, the use of the toilet will be
clean and hygienic.
There is a thermal seat included in the Green Toilet package with separate installation
instructions.
Assembly of ventilation
The ventilation pipe should be led as straight as possible to the roof level. Usually, it is
assembled to the back of the outhouse wall with the metal holders, which can be bent for
fixing to the wall. With the flexible pipe, you can adjust where to fix the pipe.
Also, a ventilation pipe hat is included, and it is placed to the top to prevent any rainfall. If
the outhouse roof is wide, it maybe necessary to make an inlet for the ventilation pipe
through the roof.
Hint! If you have to bend and make curves to the ventilation pipe,
it's a good idea to add a wind fan (an accessory) to the top of the
pipe to boost dehydration and ventilation.
When the place for the Green Toilet is ready and the ventilation duct fixed, you can place
the Green Toilet container below the seat. Finally, attach the flexible pipe, liquid hose and
the canister.
ASSEMBLY
5