AFS Z-Line Istruzioni per l'installazione - Pagina 3
Sfoglia online o scarica il pdf Istruzioni per l'installazione per Cremagliere e cavalletti AFS Z-Line. AFS Z-Line 4. Standard boltless rack
7.
Attach the remaining shelf supports at the desired
shelf levels, making
sure that all shelf
supports are
completely
seated in the
upright slots.
NOTE: If you
have purchased
additional shelf
levels, the shelf
supports for the
extra levels may
also be inserted
at this time.
8.
Attach shelf
reinforcements
(Ref. No. 4) at
each level by
inserting the
keyhole slots
on the reinforce-
ment over the
rivets on the
supports and
tapping them
firmly into place,
as shown above.
NOTE:
Recommended
number of
reinforcements
per shelf are as
follows:
48" w = 1 reinforcement
72" w = 2 reinforcements
96" w = 3 reinforcements
American Filing Solutions P.O. Box 891719, Temecula, CA 92589 Toll Free: (888) 891-1970 x 8958 Fax: (888) 891-9970 Email: [email protected] www.FilingToday.com
9.
If particleboard decking (Ref. No. 5) was
ordered, place the
decking on each
shelving level.
The decking should
fit flat on top of the
shelf supports and
reinforcements.
NOTE: If you
ordered wire
decking, it will fit
onto the unit in
the same way as
described above.
If you have
purchased a
single unit, your
shelving unit is
now complete and
ready to use.
For adder units,
see step 10.
10.
If joining more than
one unit together, your
original unit should have been
assembled with ZTP uprights on one end, as
described in step 5. Simply
continue adding shelf
supports and uprights
to complete your
additional units.