Garage Tek GT1006 Manuale d'installazione e d'uso - Pagina 4

Sfoglia online o scarica il pdf Manuale d'installazione e d'uso per Cremagliere e cavalletti Garage Tek GT1006. Garage Tek GT1006 6. Tall cabinet

J
B
i
STEP 5: INSTALL DOOR BIN, SHELVES AND LOGO
A.
SNAP THE DOOR BIN (J), QTY 1, IN THE TRACKS ON THE INSIDE OF THE DOOR AT ELEVATION WHERE SHELF WILL
NOT BE LOCATED
B.
SNAP THE SHELF STRIPS (i) X12 , INTO THE VERTICAL TRACKS AROUND THE INSIDE OF THE CABINET. THERE ARE X4
STRIPS PER LOCATION. THE STRIPS WITH THE ARCHED HOOD ARE IN THE BACK OF THE CABINET AND THE FLAT
TOPPED STRIPS ARE ON THE SIDES. PLACE THE SHELVES (C) X3, ON THE STRIP HOLDER STRIPS (i).
C.
APPLY THE GT LOGO (P), X1, ON THE LOCATION SHOWN.
ADDITIONAL SHELVES (C), STRIPS (i) AND DOOR BINS (J) CAN BE PURCHASED AS ADDITIONAL ACCESSORIES
CABINET SHOWN WITH OPENED DOORS
TOP
DOOR
DRILL (2)
3/16" HOLES
STEP 6: INSTALL HANDLE SET
A.
OPEN BOTH DOORS AND DRILL (2) 3/16" HOLES THROUGH THE DOORS AS INDICATED ABOVE.
B.
ORIENTATE THE LEFT & RIGHT HANDLES (G) AS SHOWN WITH THE PADLOCK HOLES IN-LINE ON EACH HANDLE AND
ARE AT THE BOTTOM OF THE HANDLE SET.
C.
DO NOT USE A POWER TOOL. HAND SCREW AND SECURE THE HANDLE WITH A 1 1/2" SCREW (H) & 7/8" LONG
SCREW (K) PER SIDE SIDE.
D.
ADJUST THE HANDLES TO BE IN-LINE AND LEVEL BY LOOSENING AND RETIGHTENING THE SCREWS AS NEEDED.
TOP
DOOR
DRILL (2)
3/16" HOLES
P
C
C
i
i
G
PADLOCK
HOLES
PAGE 4 OF 6 REV SEPT 2021