Kohler BELAY K-23769T-RCP Manuale di istruzioni per l'installazione - Pagina 5
Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione per Apparecchiature per il bagno Kohler BELAY K-23769T-RCP. Kohler BELAY K-23769T-RCP 23.
INSTALLATION REQUIREMENTS
A. Tools Required
·
Adjustable pipe
wrench
·
Rule
·
Level
·
Safety shoes
·
Safety glasses
·
Square
·
Screwdriver
·
Pliers
·
Utility knife
·
Adjustable wrench
C. Installation Note
Read the entire installation instructions included with
fixture before beginning the installation.
D. Clearance Requirements
Check the roughing-in and room dimensions to provide
adequate available space for the bath unit.
SITE REQUIREMENTS
A. Site Preparation
NOTICE: Measure your product for site preparation.
Check the roughing-in for additional information.
·
Make sure the flooring offers adequate support for
your bath. Verify the subfloor is flat and level
·
Make sure the drain location correspond to the bath
outlet.
·
K-156T-LCP/RCP is designed for below-the-floor
drain installation. For below-the-floor drain
installations, measure and cut a channel in the
subfloor to accommodate the drain pipe and fittings.
Refer to the roughing-in sheet.
BEFORE INSTALLATION
A. Protect the Bath Unit
Cover the bath with a protective layer or similar
material. Be careful not to scratch the bath surface.
1397340-T01-A
B. Materials Required
· Plumbers putty
·
Wall coverings(as necessary)
·
Silicone sealant
·
Gypsum cement(optional)
·
Construction adhesive
(optional)
·
Protective covering for
bathtub
·
Nails
·
Conventional woodworking
tools and materials
·
Drop cloth
A.
·
·
·
·
·
·
·
·
·
·
C.
D.
A.
·
·
· K-156T-LCP/RCP
A.
-5-
B.
·
·
(
)
·
·
(
)
·
(
)
·
·
·
·