Kohler K-1109 Manuale di installazione - Pagina 9

Sfoglia online o scarica il pdf Manuale di installazione per Vasche da bagno Kohler K-1109. Kohler K-1109 36. Bath whirlpool
Anche per Kohler K-1109: Manuale di installazione (32 pagine), Manuale del proprietario di casa (36 pagine)

Kohler K-1109 Manuale di installazione

8. Test Run the Whirlpool

Check all electrical connections, and make sure the electrical power to the whirlpool and heater (if
equipped) is on.
Make sure all union connections to the pump and heater are securely hand tightened.
Verify that the pump banding straps have been cut (if applicable), and that the pump is resting
directly on the subfloor or whirlpool base.
Fill the whirlpool to a level at least 2" (5.1 cm) above the top of the highest jet.
Operate the whirlpool for 5 minutes, and check all whirlpool piping connections for leaks.
For additional information on whirlpool operation, refer to "Confirm Proper Operation".
Kohler Co.
9
1012295-2-D