Kohler Englefield VALENCIA Manuale di istruzioni per l'installazione - Pagina 6

Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione per Arredamento per interni Kohler Englefield VALENCIA. Kohler Englefield VALENCIA 7. Double drawer vanity
Anche per Kohler Englefield VALENCIA: Manuale di istruzioni per l'installazione (7 pagine)

Kohler Englefield VALENCIA Manuale di istruzioni per l'installazione
®
VALENCIA
/ VALENCIA ELITE
7 Drawer re-installation
a) To re-install the drawer, extend the runners.
Place the drawer onto the runners and slide it
back so that the runner hooks insert into the
rear of the drawer.
(b) Make sure the locator pins line up with the
holes in the bottom of the drawer and press
the drawer down so that the pins slot into place.
Locator pin
(c) For 77296 A-*: Re-install the cabinet door.
Hook the hinges onto the base plates and press
down as shown.
1278274-A02-D September 2023
®
Double Drawer Vanity
VALENCIA
5 Vanity top
(a) Unpack the top and check for any damage that
(b) Apply a continuous bead of silicone (not
Runner hook
*Mount Screws will
need to unscrewed
before removing the
drawer for latest
runners setup.
6 Waste and tapware
Hook
Page6
Vanity
INSTALLATION INSTRUCTIONS
TM
8. Drawer Height Adjustment
(a) Remove the drawer. To tilt the drawer front
forward before adjusting the height of drawer.
might have occured in transit. Check and
confirm the fit of your selected tapware.
supplied) to the top edge of the cabinet sides
and back. Ensure there are no gaps in the
sealant bead. This will ensure the top stays
securely fitted to the cabinet and no water
spillage will find its way into the cabinet.
No silicone on
front edge
(b) Turn anticlockwise on the locator pin spacer
to raise the height of the drawer and turn clock-
wise to raise down. Repeat on the other runner.
Height Adjustment
(c) Place the vanity top onto the cabinet ensuring
that the back is flush against the wall and
there is an even overhang on either side of the
cabinet.
UP
=
Note: All drawers are aligned during assembly. However
further adjustment is often required after installation.
Please ensure the cabinet has not been twisted
and installed correctly before adjusting.
(d) Wipe off any excess sealant.
9 Sealing
(a) All edges MUST be sealed with an approved
Silicone Sealant.
(a) Fit the waste and tapware. Connect the water
supply to the taps and waste pipe to the waste
outlet.
(b) Run hot and cold water and check for leaks.
When satisfied with the results move on to the
next section.
INSTALLATION COMPLETE
Runner hook
Front Sectional View
=
DOWN
englefield.co.nz
7 Dr
(a) T
P
so
th
(b) M
ho
dr
8 Se
(a) A
Si
- B
- B
- B