Dell PowerEdge 4x00 Series Manuale di installazione - Pagina 33
Sfoglia online o scarica il pdf Manuale di installazione per Server Dell PowerEdge 4x00 Series. Dell PowerEdge 4x00 Series 37. Rack installation guide
Anche per Dell PowerEdge 4x00 Series: Manuale di installazione (28 pagine), Installazione del rack (37 pagine), Manuale d'uso (42 pagine), Installazione del rack (34 pagine)
05KCEeb1.fm Page 17 Thursday, September 14, 2000 1:37 PM
5HY ),/( /2&$7,21 5???0XOWL?9?.&(HEIP
support.dell.com
Reversing the Cable-Management Arm Installation
1.
Turn the cable-management arm over (see Figure 1-13).
pull pin
offset
hinge
rail-mounting
plate
Figure 1-13. Reversing the Cable-Management Arm
2.
Remove the pull pins from the offset hinge of the cable-management arm.
3.
Remove the rail-mounting plate.
NOTE: Make note of the orientation of the rail-mounting plate to the vertical rail.
4.
Pull the hinge away from the cable-management arm assembly.
5.
Position the offset hinge next to the cable-management arm assembly.
6.
Replace the pull pin with the ring facing up.
7.
Replace the rail-mounting plate in the same orientation to the opposite vertical
rail.
8.
Replace the second pull pin with the ring facing up.
9.
Perform the steps to install the cable-management arm. The opposite vertical rail
and the slotted pocket on the opposite side of the cable tray are used for reverse
the installation of the cable-management arm.
'(// &21),'(17,$/ 3UHOLPLQDU\
latch pin
Rack Installation Guide
1-17