Dell PowerConnect W-650 Manuale di installazione - Pagina 13
Sfoglia online o scarica il pdf Manuale di installazione per Interruttore Dell PowerConnect W-650. Dell PowerConnect W-650 20. Dell networking w-600 controller series
Anche per Dell PowerConnect W-650: Manuale integrativo (42 pagine), Specifiche tecniche (2 pagine)
Pre-Installation Requirements
The following tools and equipment are required for installation of a W-650 Series controller.
Rack Mount Bracket (x2, not used for tabletop installation)
Suitable Screwdrivers
AC Power Cord (country-specific)
Left and right side bezels (not used for rack mounting)
Caution: Installation and service of Dell Networks products should be performed by Professional Installers. Additional antenna
and transmit power information for Professional Installers can be found at https://support.dell.com.
For a Telecom Rack:
M3, 6mm x 0.5mm Phillips Head Screws (6x, included)
12-24 x 5/8" Phillips Head Screws (4x, included)
For a Server Rack:
M3, 6mm x 0.5mm Phillips Head Screws (6x, included)
M6 x 20mm Phillips Head Screws (4x, included)
M6 Cage Nuts (4x, included) or M6 Cage Clips (4x, included)
Installation in a Telecom Rack
To install a W-650 Series controller into a 19-inch (48.26 cm) Telecom rack system:
1. Place a rack mount bracket over the mounting holes on one side of the controller (see
2. Secure the bracket to the controller using three M3, 6mm x 0.5mm phillips head screws and a screwdriver.
3. Repeat these steps on the opposite side of the controller.
Dell PowerConnect W-650 Controller | Installation Guide
Chapter 2
W-650 Series Installation
Figure
W-650 Series Installation |
6).
13