ABB AP103 Manuale - Pagina 3
Sfoglia online o scarica il pdf Manuale per Apparecchiature industriali ABB AP103. ABB AP103 16. Ph/redox (orp) cartridge sensors with water-wash option
Anche per ABB AP103: Manuale di istruzioni (16 pagine)
CONTENTS
1 INTRODUCTION ............................................................. 2
1.1 Purpose ............................................................... 2
1.2 Cartridges and Cartridge Systems ...................... 2
2 INSTALLATION ............................................................... 4
2.1 Typical Installation ............................................... 4
2.2 Water Supply for Water Wash Systems .............. 5
2.3 Preparing the Electrode Cartridge ....................... 6
2.4 Installing the Electrode Cartridge ........................ 6
2.4.1 In-line pH Systems .................................. 6
2.4.3 Dip Systems (pH and Redox) .................. 8
2.4.4 Cable Termination ................................... 9
3 CALIBRATION ................................................................ 9
4 MAINTENANCE ............................................................ 10
4.1 General Cleaning .............................................. 10
4.2 Liquid Junction and Electrolyte Level ................ 10
4.2.1 Replacing Liquid Junction ..................... 10
4.2.2 Checking Electrolyte Level .................... 10
4.3 Storage of the Electrode .................................... 10
5 SPARES ........................................................................ 11
1