ABB AP103 Manual - Page 3
Browse online or download pdf Manual for Industrial Equipment ABB AP103. ABB AP103 16 pages. Ph/redox (orp) cartridge sensors with water-wash option
Also for ABB AP103: Instruction Manual (16 pages)
CONTENTS
1 INTRODUCTION ............................................................. 2
1.1 Purpose ............................................................... 2
1.2 Cartridges and Cartridge Systems ...................... 2
2 INSTALLATION ............................................................... 4
2.1 Typical Installation ............................................... 4
2.2 Water Supply for Water Wash Systems .............. 5
2.3 Preparing the Electrode Cartridge ....................... 6
2.4 Installing the Electrode Cartridge ........................ 6
2.4.1 In-line pH Systems .................................. 6
2.4.3 Dip Systems (pH and Redox) .................. 8
2.4.4 Cable Termination ................................... 9
3 CALIBRATION ................................................................ 9
4 MAINTENANCE ............................................................ 10
4.1 General Cleaning .............................................. 10
4.2 Liquid Junction and Electrolyte Level ................ 10
4.2.1 Replacing Liquid Junction ..................... 10
4.2.2 Checking Electrolyte Level .................... 10
4.3 Storage of the Electrode .................................... 10
5 SPARES ........................................................................ 11
1