Diehl Metering IZAR RDC Manuale d'uso - Pagina 10
Sfoglia online o scarica il pdf Manuale d'uso per Camera Accessories Diehl Metering IZAR RDC. Diehl Metering IZAR RDC 20.
IZAR RDC Battery
3.8 WALL MOUNTING AND SCREW FIXING
A drilling template is provided with the installation guide to facilitate positioning and installation on
the wall.
4 CONFIGURATION / STARTING UP
IZAR RDC BATTERY must be programmed on-site via a Bluetooth or Bluetooth Low Energy interface
using the IZAR@RDCBV Config software.
Please refer to the IZAR@RDCBV Config software user guide.
5 IDENTIFICATION
Data matrix contents:
10
08/2019