Diehl Metering IZAR RDC Manual do utilizador - Página 10
Procurar online ou descarregar pdf Manual do utilizador para Acessórios para câmaras Diehl Metering IZAR RDC. Diehl Metering IZAR RDC 20 páginas.
IZAR RDC Battery
3.8 WALL MOUNTING AND SCREW FIXING
A drilling template is provided with the installation guide to facilitate positioning and installation on
the wall.
4 CONFIGURATION / STARTING UP
IZAR RDC BATTERY must be programmed on-site via a Bluetooth or Bluetooth Low Energy interface
using the IZAR@RDCBV Config software.
Please refer to the IZAR@RDCBV Config software user guide.
5 IDENTIFICATION
Data matrix contents:
10
08/2019