ABB C1900 Series Manuale operativo - Pagina 6

Sfoglia online o scarica il pdf Manuale operativo per Strumenti di misura ABB C1900 Series. ABB C1900 Series 20. Circular chart recorder and recorder/controller
Anche per ABB C1900 Series: Manuale di installazione (20 pagine), Manuale d'uso (20 pagine), Manuale di istruzioni per l'uso (12 pagine), Manuale di installazione (20 pagine), Manuale di installazione (16 pagine)

ABB C1900 Series Manuale operativo
...2 SETTING UP
2.2 Fitting the Chart – Fig. 2.4
Rotate chart to align the
5
time line with the red pen
(see also Fig. 2.1)
6
Fig. 2.4 Fitting the Chart
4
1
Raise pens
Lift the chart clamp
2
and remove the chart
Fit new chart ensuring
3
that it is beneath the
pen lifter bars
4
Locate chart
under guides
Lower the chart clamp
2.3 Fitting the Pen Capsule(s) – Fig. 2.5
3
Remove spent
capsule
Lifter bars
6
Ensure that the arm is
positioned above its lifter
bar
Fig. 2.5 Fitting the Pen Capsules
Raise pens
1
Gently pull the arm off
2
the bracket – see
Note
Note. Take care not
to bend the arms
during removal and
refitting,
as
pen
clashing may result.
Fit new pen capsule
4
ensuring that the arm
locates in the pen
capsule slot
5
Remove cap
Slide pen assembly onto
7
the appropriate bracket
until it clips into place –
see
Note