ABB C1900 Series Bedieningshandleiding - Pagina 6

Blader online of download pdf Bedieningshandleiding voor {categorie_naam} ABB C1900 Series. ABB C1900 Series 20 pagina's. Circular chart recorder and recorder/controller
Ook voor ABB C1900 Series: Installatiehandleiding (20 pagina's), Gebruikershandleiding (20 pagina's), Gebruiksaanwijzing (12 pagina's), Installatiehandleiding (20 pagina's), Installatiehandleiding (16 pagina's)

ABB C1900 Series Bedieningshandleiding
...2 SETTING UP
2.2 Fitting the Chart – Fig. 2.4
Rotate chart to align the
5
time line with the red pen
(see also Fig. 2.1)
6
Fig. 2.4 Fitting the Chart
4
1
Raise pens
Lift the chart clamp
2
and remove the chart
Fit new chart ensuring
3
that it is beneath the
pen lifter bars
4
Locate chart
under guides
Lower the chart clamp
2.3 Fitting the Pen Capsule(s) – Fig. 2.5
3
Remove spent
capsule
Lifter bars
6
Ensure that the arm is
positioned above its lifter
bar
Fig. 2.5 Fitting the Pen Capsules
Raise pens
1
Gently pull the arm off
2
the bracket – see
Note
Note. Take care not
to bend the arms
during removal and
refitting,
as
pen
clashing may result.
Fit new pen capsule
4
ensuring that the arm
locates in the pen
capsule slot
5
Remove cap
Slide pen assembly onto
7
the appropriate bracket
until it clips into place –
see
Note