Cisco WS-F6K-MSFC2 Nota di installazione - Pagina 8

Sfoglia online o scarica il pdf Nota di installazione per Hardware di rete Cisco WS-F6K-MSFC2. Cisco WS-F6K-MSFC2 18. Catalyst 6000 series multilayer switch feature card 2

Removing the MSFC from the Supervisor Engine 1A

To prepare the supervisor engine, follow these steps:
Upload the current configuration to a server. On any modules running Cisco IOS, save the running
Step 1
configuration.
Shut down the switch.
Step 2
Remove the supervisor engine from the Catalyst 6000 family switch. (Refer to the Catalyst 6000
Step 3
Family Module Installation Guide for removal instructions.)
Place the supervisor engine on an antistatic mat or foam.
Step 4
To remove the MSFC from the Supervisor Engine 1A, see the
Engine 1A" section on page 8
To install the MSFC2 on a Supervisor Engine 2, see the
follow the instructions for installing the MSFC2.
Removing the MSFC from the Supervisor Engine 1A
Note
You must remove the Flash SIMM from the MSFC to access two mounting screws that are located
under the SIMM.
Handle the SIMM by its edges only; avoid touching the memory module, pins, or traces (the metal
Caution
fingers along the connector edge of the SIMM). SIMMs are sensitive components that are susceptible
to ESD damage and can be shorted by mishandling.
To remove the MSFC from the Supervisor Engine 1A, follow these steps:
Note that the Flash SIMM is located at the rear of the MSFC (see
Step 1
clips on both sides of the Flash SIMM outward and tilt the Flash SIMM free of the clips (see
Be careful not to break the clips on the Flash SIMM connector.
Catalyst 6000 Family Multilayer Switch Feature Card 2 Installation Note
8
and follow the instructions for removing the MSFC.
"Installing the MSFC2" section on page 10
"Removing the MSFC from the Supervisor
Figure
1). Pull the locking spring
and
Figure
2).
78-10605-03