Cisco ONS 15454 Installare - Pagina 4
Sfoglia online o scarica il pdf Installare per Server Cisco ONS 15454. Cisco ONS 15454 32. Four-shelf and zero-shelf bay assembly
Anche per Cisco ONS 15454: Manuale di istruzioni per l'installazione (22 pagine), Installare (32 pagine), Disimballaggio e installazione (42 pagine), Disimballaggio e installazione (40 pagine)
NTP-A1 Unpack and Inspect the ONS 15454 Shelf Assembly
•
Tools Needed
The following tools are needed to install an ONS 15454:
•
•
•
•
•
•
•
•
Test Equipment
The following test equipment is needed to install an ONS 15454:
•
•
•
NTP-A1 Unpack and Inspect the ONS 15454 Shelf Assembly
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
Note
The ONS 15454 high-density shelf (15454-SA-HD) is required if you want to use the high-density
electrical cards (48-port DS-3 and 56-port DS-1), available in a future release.
Complete the
Step 1
Step 2
Complete the
Step 3
Continue with the
Stop. You have completed this procedure.
Cisco ONS 15454 Procedure Guide, R5.0
1-4
Listed pressure terminal connectors such as ring and fork types; connectors must be suitable for
#10 AWG copper conductors
#2 Phillips screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
Wire wrapper
Wire cutters
Wire strippers
Crimp tool
BNC insertion tool
Voltmeter
Optical power meter (for use with fiber optics only)
Bit error rate (BER) tester, DS-1 and DS-3
This procedure unpacks the ONS 15454 and verifies the contents.
Pinned hex (Allen) key for front door
Required
Onsite
None
"DLP-A1 Unpack and Verify the Shelf Assembly" task on page
"DLP-A2 Inspect the Shelf Assembly" task on page
"NTP-A2 Install the Shelf Assembly" procedure on page
Chapter 1
Install the Shelf and Backplane Cable
17-1.
17-2.
1-5.
March 2005