Cisco RF Gateway 10 Manuale di avvio rapido - Pagina 17
Sfoglia online o scarica il pdf Manuale di avvio rapido per Porta d'ingresso Cisco RF Gateway 10. Cisco RF Gateway 10 41. Cisco systems rf gateway quick start guide
Figure 12
Chassis Installation Bracket
Chassis
installation
bracket
With two people, lift the chassis (partially unloaded) into position between the rack posts and rest it on the chassis
Step 4
installation bracket.
Position the chassis until the rack-mounting flanges flush against the mounting rails on the rack.
Step 5
Hold the chassis in position against the mounting rails and follow these steps:
Step 6
a. Insert a bottom screw into the rack-mount ear on each side and use a hand-held screwdriver to tighten the screw to the
rack rail.
In the next step, insert the top screw diagonally from the bottom screw that you just attached. This helps to keep the
Tip
chassis in place.
b. Insert a top screw into each side rack-mount bracket and tighten the screw to the rack rail.
c. Insert a minimum of four screws per bracket on both sides of the chassis.
Ensure that all the screws on each side of the rack-mount brackets are tightened to the equipment rack before the chassis
Step 7
installation bracket is removed from the rack.
Connecting the Chassis to Ground
Connecting the Cisco RFGW-10 chassis to the earth ground is required for all installations. The earth ground connections
located on the faceplate of each DC PEM must be connected to the earth ground. For installations requiring NEBS certification,
a dedicated double hole lug chassis ground connection point is provided in the lower left corner on the rear of the chassis.
Warning
This equipment must be grounded. Never defeat the ground conductor or operate the equipment in the absence of
a suitably installed ground conductor. Contact the appropriate electrical inspection authority or an electrician if
you are uncertain that suitable grounding is available. Statement 1024.
17