Ecoplus SWBC-13.5H-B Manuale di istruzioni per l'installazione - Pagina 15
Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione per Pompa di calore Ecoplus SWBC-13.5H-B. Ecoplus SWBC-13.5H-B 20. Air source heat pump water heater
- 1. Table of Contents
- 2. Ⅰ.to Our Customers(before Installation)
- 3. Ⅱ.product Introducing
- 4. Ⅲ.work Principle
- 5. Ⅳ.performance Data
- 6. Ⅴ.dimension
- 7. Ⅵ.operation Introductions
- 8. Ⅶ.wire Circuit Diagram
- 9. Ⅷ.installation Instructions
- 9. Installation Instructions
- 9. Installation Instructions
- 10. Ⅸ.maintenance
Ⅷ.Installation instructions
Installation instructions
1. Unit installation
1).Installation location
Host unit
1 Should be installed in a larger & well-ventilated place.
1 Installation location should ensure unhindered access outlet (inlet & outlet shown as
below).
1 Install gutter or set up positions near the outfall, to facilitate the drainage.
1 The installation base or bracket should be steady, to ensure the smooth operation of
running units.
1 Make sure the unit is vertical after installation, and no incline.
1 Make sure not to install the host unit in the any conditioner of pollution, corrosive gases,
sun and fallen leaves, etc.
1 Installation location must not next to place of incendive , easy-explosion and fire .
1 Installation must pay attention to the distance between the barriers shown in below
picture (pay attention to arrow direction).
2000mm above the top
Air outlet
Air inlet
Above 1000mm
Water tank
1 Water tanks should be placed where ambient temperature is above 0℃ .
1 Can be installed outdoors or the top of the building (based on the size of water tanks and
the load-bearing capacity of the building and so on).
1 Do not install water tanks in the pollution, corrosive gases place.
2).Unit installation
1 Units base can be installed as cement concrete structures, steel brackets can also be used,
add the shockproof rubber pads , make the base surface flat.
1 Units can be designed based on the working performance.
(See Table of technical performance parameters)
1 Unit should have drain or drainage inlets.
1 Normally required to install in the place where setted cement concrete base.
Air inlet
Heat pump
Above 1000mm
1000mm above the top
Air inlet
Air inlet
Above 1000mm
13
Water heater
Air inlet
Above 1000mm
Above 1000mm