Zanussi ZHC 95 ALU Libretto di istruzioni - Pagina 18
Sfoglia online o scarica il pdf Libretto di istruzioni per Cappa di ventilazione Zanussi ZHC 95 ALU. Zanussi ZHC 95 ALU 20. Cooker hood
Anche per Zanussi ZHC 95 ALU: Libretto di istruzioni (20 pagine), Libretto di istruzioni (18 pagine)
Ducting or re-circulation fitting
Ducting fitting.
This is possible for all forms of installation:
a) Connect the air outlet to the external ducting system.
b) Remove the activated charcoal filter (if there is one)inside the hood canopy
(see Maintenance).
Re-circulation fitting
This is only possible with the air outlet directed upwards. Fit the venting grille G
onto the air outlet.The activated charcoal filter should be fitted inside the hood
canopy after connection to the power supply.
Connection to power supply and checking of good working
order
1 - It is absolutely necessary to follow the warnings 3.2,3.3 and 3.4 of paragraph 3,
concerning safety measures.
2 - Loosen the two locking screws and remove the metal cover.
Connect the hood connection to the engine connection (a).Correctly place the
connectors under the cover and tighten the two locking screws (b).
3 - Once electrical connection has been carried out, check that lights, engine and
change of speed work.
4 - Fit the lower grill and the activated carbon filter (only for filter mode)(see Maintenance).
INSTALLATION INSTRUCTIONS
S36_26
a
b
18
G
S36_27