ACORN AQUA A112408B/S-VR-UBL Istruzioni per l'installazione, il funzionamento e la manutenzione - Pagina 4

Sfoglia online o scarica il pdf Istruzioni per l'installazione, il funzionamento e la manutenzione per Distributore d'acqua ACORN AQUA A112408B/S-VR-UBL. ACORN AQUA A112408B/S-VR-UBL 8. Vandal resistant refrigerated universal bi-level aquaaccess barrier free, wall mounted water cooler

STANDARD WASTE CONFIGURATION

INSTALLATION:

Choose configuration; Remove and reinstall filler plate, item 30 , reverse drain assembly
if required for alternate mounting configuration.
1. Mount hanger bracket to wall horizontally level as shown in Roughing-In and Dimensional Drawing.
Note: Adjust height of bracket if bubbler outlet height is required to vary from that shown.
WARNING: Hanger Bracket MUST be securely anchored to wall with fasteners sufficient to support
3 times the weight of cooler. If wall can not provide adequate support, order and install optional
fixture support carrier.
2. Remove the bottom cover from the water cooler and set aside in a safe place. Save the screws
in a secure location for re-use in later stages of installation.
3.
Hang the water coolers on the hanger brackets ensuring the bracket tabs engage AND seat in the
slots in the back of the water coolers. Note: Hanging of refrigerated unit first is recommended since
it is the heavier of the two. Verify water coolers are level, left to right AND front to back from bottom
of unit.
Caution: The bubbler stream may be adversely affected if units are not square and level. Bottom of
units and louvers should be used as reference to verify unit is square and plumb.
4. Anchor the water coolers to the wall at the lower mounting points in each back panel. Shim lower
mounting points to level unit if necessary.
5. Outlet tube from evaporator has an in-line tee with a tube going to refrigerated unit's valve and the
"TEE" not connected. Connect the loose supply tube from refrigerated unit to the "TEE".
6. Thoroughly flush the 3/8" O.D. supply line and then connect water cooler to water supply angle
stop valve (by others) with supplied 3/8" O.D. copper tube.
7. Use supplied flexible hose and clamps to connect waste tailpiece from upper unit to waste tailpiece
of lower unit and then make up 1-1/4" O.D. p-trap waste connection. Waste p-trap by others.
START UP:
1. Before connecting power supply and assembling bottom cover to water cooler, but after thoroughly
flushing the supply line and connecting it to the fixture, turn on building water supply and check all
connections for leaks.
2. Air within the water cooler system or the structure supply piping will cause an irregular bubbler
outlet stream until purged out by incoming water. Covering the bubbler with a clean cup (or
similar object) is recommended when first activating water cooler to prevent excessive splashing.
Depress the pushbutton until steady water stream is achieved.
3. If water flow requires adjustment, insert a slotted narrow blade screwdriver through the hole
centered on the pushbutton to the flow regulator. Turning clockwise will increase flow and turning
counterclockwise will decrease flow.
4. Recheck all water and drain connections with water flowing through system.
5. With power still NOT connected, carefully manually rotate cooling fan to insure proper clearance
and free fan action.
6. Plug water cooler in to electrical outlet and make sure unit begins to function.
7. Assemble bottom cover to water cooler with screws furnished.
ITEM 30
FILLER PLATE
Page 4 of 8
ITEM 30
FILLER PLATE
ALTERNATE WASTE CONFIGURATION