ASGCO CHEVRON Manuale di istruzioni per l'installazione, il funzionamento e la manutenzione - Pagina 12
Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione, il funzionamento e la manutenzione per Pulitore a ultrasuoni per gioielli ASGCO CHEVRON. ASGCO CHEVRON 12. Belt cleaners
Maintenance
ASGCO Mfg., Inc.
The second shaft is installed with all of the discs bending in the opposite
direction. Continue to alternate the direction of the discs in each
subsequent shaft installation.
Head
Pulley
Move on to the next Chevron shaft installation, using this same step-by-
step procedure. Remember that the direction of the discs must be
alternated on each subsequent installation.
• When used in a 24-hour operation, the Chevron must be adjusted every
four months. Grease hoses should be installed if the Chevron mounting
location prevents easy lubrication.
• Grease the bearing periodically.
• Operation of the conveyor belt without material should be kept to a
minimum.
11
Snub
Pulley
CHEVRON