- ページ 7
農機具 Baroness SP05のPDF 組立・設置マニュアルをオンラインで閲覧またはダウンロードできます。Baroness SP05 9 ページ。 Sand cultivator.
bunker rake
Baroness SP05 にも: 組立・設置マニュアル (12 ページ)
SP05
Installing the Front Blade Section
Steps
5
6
7
8
SP05----AM01USZ
Illustrations
Descriptions
Apply grease to part G of the front blade (6) and
install the front blade ass'y to the front blade arms
(1).
Install the delta pin (7) to part H on both sides.
Install the arm backing plate COMP (8) to part I
located at the right side of the frame (the right side
of the machine) with the washer (9), S washer (3),
and bolt (10).
Adjust the arm backing plate COMP (8) so that the
distance between the grip of the front blade lever
(5) and the upper surface of the step sheet is about
25 mm (1 in.) and secure it with the bolt (10).
Adjust the arm backing plate COMP (8) so that
there is a little clearance when the grip is held and
so that the grip is easy to hold.
4