Baroness SP05 조립 및 설치 매뉴얼 - 페이지 7
{카테고리_이름} Baroness SP05에 대한 조립 및 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Baroness SP05 9 페이지. Sand cultivator.
bunker rake
Baroness SP05에 대해서도 마찬가지입니다: 조립 및 설치 매뉴얼 (12 페이지)
SP05
Installing the Front Blade Section
Steps
5
6
7
8
SP05----AM01USZ
Illustrations
Descriptions
Apply grease to part G of the front blade (6) and
install the front blade ass'y to the front blade arms
(1).
Install the delta pin (7) to part H on both sides.
Install the arm backing plate COMP (8) to part I
located at the right side of the frame (the right side
of the machine) with the washer (9), S washer (3),
and bolt (10).
Adjust the arm backing plate COMP (8) so that the
distance between the grip of the front blade lever
(5) and the upper surface of the step sheet is about
25 mm (1 in.) and secure it with the bolt (10).
Adjust the arm backing plate COMP (8) so that
there is a little clearance when the grip is held and
so that the grip is easy to hold.
4