Baroness SP05 조립 및 설치 매뉴얼 - 페이지 9
{카테고리_이름} Baroness SP05에 대한 조립 및 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Baroness SP05 9 페이지. Sand cultivator.
bunker rake
Baroness SP05에 대해서도 마찬가지입니다: 조립 및 설치 매뉴얼 (12 페이지)
SP05
Installing the Front Blade Section
Steps
13
14
Removing the Front Blade Section (See the illustrations for installing the front blade section.)
1.
Remove the spring hook (13) from the frame (O) and part P of the front blade arms.
2.
Remove the connecting shaft (11) from the upper part of the front blade lever (5) and front blade arms (1).
3.
Remove the delta pin (7) and then remove the front (6) from the front blade arms (1).
4.
Remove the washer (2), S washer (3), and bolt (4), and then remove the front blade arms (1).
5.
Remove the light mounting bolt (D) and then remove the front blade lever (5).
6.
Re-mount the light ass'y (E) with the light mounting bolt (D).
7.
Remove the washer (9), S washer (3), and bolt (10) from the right side of the frame (the right side of the
machine), and then remove the arm backing plate COMP (8).
SP05----AM01USZ
Illustrations
Descriptions
Remove the S washer (3) and nut (12), loosen the
nut (L), and rotate the L-ball (M) and screw shaft
(N) to the left and right to adjust the length of the
connecting shaft (11).
After adjusting the front blade section, install and
fully tighten the S washer (3) and nut (12).
Insert the spring hook (13) into the frame (O) (the
middle hole of the five holes) and part P of the
front blade arms. This completes the installation.
*The spring tension can be adjusted by inserting
the spring hook into a different hole. Adjust the
spring hook to the desired tension.
6