- ページ 2

産業機器 Dover TWG 250PRのPDF サービス&リペアマニュアルをオンラインで閲覧またはダウンロードできます。Dover TWG 250PR 19 ページ。

Dover TWG 250PR サービス&リペアマニュアル
FAILURE TO HEED THE FOLLOWING WARNINGS MAY
RESULT IN SERIOUS INJURY OR DEATH!
Operators/Technicians must be trained in the proper, safe operation of the swing-drive gearbox.
All shields and guards must be in place during operation of swing-drive gearbox.
Be aware of and stay clear of all pinch points during operation of swing-drive gearbox.
Boom must be stowed and properly secured while removing swing-drive gearbox.
Avoid shock loads. This type of load could impose a torque many times the actual torque rating
of the swing-drive gearbox.
Make sure that all equipment, including the swing-drive gearbox is maintained properly.
Counterbalance valves are pre-set from the factory and must not be adjusted.

SAFETY NOTES

2