Dover TWG 250PR Посібник з обслуговування та ремонту - Сторінка 2
Переглянути онлайн або завантажити pdf Посібник з обслуговування та ремонту для Промислове обладнання Dover TWG 250PR. Dover TWG 250PR 19 сторінок.
FAILURE TO HEED THE FOLLOWING WARNINGS MAY
RESULT IN SERIOUS INJURY OR DEATH!
•
Operators/Technicians must be trained in the proper, safe operation of the swing-drive gearbox.
•
All shields and guards must be in place during operation of swing-drive gearbox.
•
Be aware of and stay clear of all pinch points during operation of swing-drive gearbox.
•
Boom must be stowed and properly secured while removing swing-drive gearbox.
•
Avoid shock loads. This type of load could impose a torque many times the actual torque rating
of the swing-drive gearbox.
•
Make sure that all equipment, including the swing-drive gearbox is maintained properly.
•
Counterbalance valves are pre-set from the factory and must not be adjusted.
SAFETY NOTES
2