- ページ 10
製氷機 Follett Horizon Elite Chewblet HCF1410RMSのPDF 取付説明書をオンラインで閲覧またはダウンロードできます。Follett Horizon Elite Chewblet HCF1410RMS 17 ページ。 Ice machine with ride technology installation instructions for ice manager diverter valve
Follett Horizon Elite Chewblet HCF1410RMS にも: 取付説明書 (16 ページ)
Connect docking assembly to ice machine.
6.1
Ice transport tube installation
➋
• Slide ice machine into docking assembly
ensuring that drain tube is fully seated on
barbed drain fitting
• Insert ice transport tube all the way into
coupling and tighten nut firmly
6.3
Refrigeration lines
➊
• Evacuate line set.
• Connect self-sealing liquid and suction
line fittings
➊
10
➊
➊
➋
Internal connections
6.2
Water solenoid, shut-off valve,
and potable water line options
If water solenoid is already mounted to
evaporator:
• Insert potable water line into shut-off valve.
If this is an undercounter installation:
• Mount water solenoid atop evaporator and
locate the shut-off valve inside the machine.
Insert potable water line into shut-off valve.
If water solenoid is not mounted and
machine will not be installed under-
counter:
• Mount water solenoid to inside rear (upper
right corner) of docking assembly using one
screw.
• Insert potable water line into shut-off valve -
locate the shut-off valve outside the machine.
•
Insert outgoing line from shut-off valve into
push-in connection of water solenoid.
6.4
Power cord
• Remove twist tie
• Carefully pass cord through opening and
plug into wall outlet
remote condensing
6
ICE MANAGER