- ページ 11

投影スクリーン Draper FoundationのPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Draper Foundation 17 ページ。 Foundation for led panels

Draper Foundation インストレーション・マニュアル
Foundation
for LED Panels
Section 10.2 - For LED arrays 7 panels or higher - 3 Horizontal Rails
Section 10.2.1 - Attaching Bottom Vertical Sections
1. Lift each Vertical Rail and position it on the middle rail.
2. Let the Vertical Rail hanger rest on the horizontal rail.
3. Slide the fastener nut from Section 8 into position
and loosely attach with the provided hardware.
4. Work from left to right until all bottom
Vertical Rails
are attached.
Section 10.2.2 - Attaching Top Vertical Sections
1. Lift each Top Section of Vertical Rail and slide it onto the connector on the bottom section.
2. Let the Vertical Rail hanger rest on the top horizontal rail and secure it loosely with provided hardware..
3. Slide the fastener nut from Section 8 into position on the bottom rail and loosely attach with the provided hardware.
4. Work from left to right until all top Vertical Rails are attached.
1
2
2
SCREW
M8-1.25x10mm
Long Flanged
Button Head
page 20 of 32
Section 11 - Adjusting Verticals
Section 11.1 - Y - Axis Adjustment
WORK GLOVES
RECOMMENDED
Section 11.1.1 - For LED arrays up to 6 panels high - 2 Horizontal Rails
1. Locate the highest Vertical Rail and shine a laser level line across utilizing the laser level notch.
2. Use a 5mm hex wrench to raise each Vertical Rail until the are all level.
Please note: All Vertical Rails must be aligned and level with each other.
Adjust Set Screw DOWN
to RAISE position of
the each Vertical Rail
LASER LINE
LASER LINE
ALIGNMENT
ALIGNMENT
NOTCHES
NOTCHES
Vertical Rails
Until Level with
Laser Line
Vertical Rails
Until Level with
Laser Line
13
(350mm)
BOTTOM OF VIEWING AREA
Foundation
for LED Panels
Adjust Vertical Rails
until notch is
level with
Laser Line
13
13
/
"
16
(350mm)
BOTTOM OF VIEWING AREA
Section 11.1.2 - For LED arrays 7 panels or higher - 3 Horizontal Rails
Each Vertical Rail section
1. Locate the highest Vertical Rail and shine a laser level line across utilizing
the laser level notch.
13
13
/
"
2. Beginning with the Lower Sections, use a 5mm hex wrench to raise each
16
(3 50 m m )
Vertical Rail until they are all level.
3. Repeat Steps 1 and 2 on the Upper Sections of each Vertical Rail.
B OT TO M O
F
VI EW IN G
Please note: All Vertical Rails must be aligned and level with each other.
A R EA
Adjust
Adjust
/
"
13
16
page 21 of 32
has its own adjustment set screw.
(upper and lower)