- ページ 9

投影スクリーン Draper FoundationのPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Draper Foundation 17 ページ。 Foundation for led panels

Draper Foundation インストレーション・マニュアル
Foundation
for LED Panels
Section 8.2 - Vertical Rail Assembly - For LED arrays 7 panels or higher - 3 Horizontal Rails
WORK GLOVES
RECOMMENDED
Section 8.2.1 - Lower Section of Vertical Rail Assembly
1. Insert Vertical Connector into TOP of the Lower Vertical Rail section and secure with provided hardware
1
1
A
VERTICAL
CONNECTOR
2
2
2. Turn the Lower Vertical Rail section over.
3. Attach two
Wall Adjuster Brackets
(2)
3
to the back side using a 3mm hex wrench.
3
Section 8.2.2 - Upper Section of Vertical Rail Assembly
1. Attach one
Wall Adjuster Bracket to the back side using a 3mm hex wrench.
(1)
page 16 of 32
.
(3mm Hex Wrench)
TOP
Front
TOP
Front
Front
TOP
Front
TOP
TURN OVER
TURN OVER
TOP
TOP
Back
Back
3mm Hex
Wrench
engaged with
differential
screw
Foundation
for LED Panels
Section 9 - Inserting Front Rail Connector and Vertical Rail Fasteners
Section 9.1 - For LED arrays up to 6 panels high - 2 Horizontal Rails
1. Insert horizontal rail connector and vertical rail fasteners into the top and bottom horizontal rails.
4x4
1
2
3
4
4 4 5
1
1
1
2
3
4
4 4 5
5x5
6 Vertical Rails
1
2
3
4
5
6
Rail
Connector
(FRONT)
1
1
2
2
1
2
3
4
5
6
Rail
Connector
(FRONT)
6x6
7 Vertical Rails
1
2
3
4
5
6
7
Rail
Connector
(FRONT)
1
1
1
2
3
4
5
6
7
Rail
Connector
(FRONT)
5 Vertical Rails
2
2
3
3
4
4
5
5
Eventual location of Vertical Rails shown
Splice
3
3
4
4
5
5
6
6
Eventual location of Vertical Rails shown
Splice
2
2
3
3
4
4
5
5
6
6
Eventual location of Vertical Rails shown
page 17 of 32
7
7