- ページ 7
投影スクリーン Draper FoundationのPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Draper Foundation 17 ページ。 Foundation for led panels
Foundation
for LED Panels
™
Section 5 - Hanging Horizontal Rails
Section 5.1 - For LED arrays up to 6 panels high - 2 Horizontal Rails
1
1
1
1. Using the top keyhole slots of the two outer wall mounting brackets,
hang the bottom horizontal rail on the pre-installed mounting hardware
.
(see Section 3, Step 5)
W A L L
2
2
2
2. Using the top keyhole slots of the outer wall mounting brackets,
hang the top horizontal rails on the pre-installed mounting hardware.
3
3
3
3. Leave all brackets loose for now. Brackets will be adjusted to fit site
conditions in Section 6 - Adjusting and Aligning Horizontal Rails.
W A L L
All Brackets
Leave
loose for now.
Brackets will be adjusted to fit site conditions in Section 6.
page 12 of 32
Fig. 5-1
Fig. 5-2
Fig. 5-3
Foundation
for LED Panels
™
Section 5.2 - For LED arrays 7 panels or higher - 3 Horizontal Rails
1. Using the top keyhole slots of the outer wall mounting brackets, hang the BOTTOM
horizontal rail on the pre-installed mounting hardware
(see Section, 3 Step 5)
2. Using the top keyhole slots of the outer wall mounting brackets, hang the MIDDLE
horizontal rail on the pre-installed mounting hardware.
3. Using the top keyhole slots of the outer wall mounting brackets, hang the TOP
horizontal rail on the pre-installed mounting hardware.
4. Leave all brackets loose for now. Brackets will be adjusted to fit site conditions in
Section 6 - Adjusting and Aligning Horizontal Rails.
W A L L
Leave
All Brackets
loose for now.
Brackets will be adjusted to fit site conditions in Section 6.
1
3
page 13 of 32
W A L L
.
2
4