- ページ 9
ボイラー Drazice OKC 250 NTRR/SOLのPDF 操作および設置マニュアルをオンラインで閲覧またはダウンロードできます。Drazice OKC 250 NTRR/SOL 17 ページ。 For solar systems
Drazice OKC 250 NTRR/SOL にも: 操作および設置マニュアル (12 ページ)
300 litre volume tanks are screwed onto the bottom wooden palette with M12 screws. When
the tank is released from the pallet and prior to its putting into operation, 3 screw legs supplied
have to be installed as the product accessories. With three adjustable legs, the tank may be
positioned vertically to the base within 10 mm range.
2 AND FITTING INSTRUCTIONS
2.1 OPERATION OPERATING CONDITIONS
The tank shall only be used in accordance with the conditions specified on the power plate
and in instructions for electric wiring. Besides the legally acknowledged national regulations
and standards, also conditions for connection defined in the local electric and water works
have to be adhered to, as well as the installation and operation manual.
The temperature at the place of the tank installation must be higher than +2°C; and the room
must not freeze. The appliance has to be mounted at a convenient place; it means that the
appliance must be easily available for potential necessary maintenance, repair or
replacement, as the case may be.
We emphasize that the tank shall not be connected to power supply if flammable liquids
(benzine, stain cleaner) or gases, etc., are handled in its proximity.
- 9 -