- ページ 12

ミシン Duerkopp Adler 195のPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Duerkopp Adler 195 14 ページ。
Duerkopp Adler 195 にも: 取扱説明書 (18 ページ)

Duerkopp Adler 195 インストレーション・マニュアル

7. Connecting the Compressed Air Maintenance Unit

5

8. Readying the Machine for Operation

12
For operation of the pressure foot stroke, stitch
condensation and thread trimming, a supply of
water-free, lightly oiled compressed air is required.
Screw the maintenance unit to the frame.
Establish the PU3-hose connection 1 between
the maintenance unit and the machine head.
With the compressed air disconnected or shut
off, fill lubricating oil ESSO SP-NK 10.
Open screw 2 and fill up to the grooved
marking.
Connect the maintenance unit connector hose
to the compressed air supply.
Pull up the handle 5 and set an operating
pressure of 6 bar by turning.
Mounting the Yarn Stand
Fill the oil tank for the central oil wick
lubrication up to the upper marking line (see
Operating Instructions Section 2.1)
Plug in the mains plug.
Briefly switch on the motor protection switch
for three phase motors.
Check the direction of rotation on the motor
ventilation wheel. See arrow on the belt guard.
If the direction of rotation is incorrect
interchange 2 phases in the mains plug.
Check the feed quantity of the oil mister
(approx. 1 drop every 10 work cycles). Correct
if necessary. See Section in the Operating
Instructions.
1
2