- ページ 11

ラック&スタンド Abtus AV813のPDF 操作マニュアルをオンラインで閲覧またはダウンロードできます。Abtus AV813 12 ページ。 Universal projector ceiling mount

3. Installation of Ceiling Mounting Kit
3.1
Install the Universal Ceiling Mounting
Kit to the ceiling. Fix Suspension Rod
by M10 expansion bolt (not included)
on the ceiling.
Refer to drawing.
3.3
Installtion completed.
* Please consult our authorized service person when you meet any trouble in
installation. We are not liable for any damage or injury caused by mishandling
or improper operation.
INSTALLATION GUIDE
3.2
Lift and insert the assembled Projector
done in step-2.9 into the lower Rod
of the Universal Ceiling Mounting Kit.
Insert the Locking Hook into the cutting
slot and tighten them with M8x50
Socket cap screw and Self-locking nut.
*Specifi cations are subject to changes without notice.
INSERT