Abtus AV813 운영 매뉴얼 - 페이지 11

{카테고리_이름} Abtus AV813에 대한 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Abtus AV813 12 페이지. Universal projector ceiling mount

3. Installation of Ceiling Mounting Kit
3.1
Install the Universal Ceiling Mounting
Kit to the ceiling. Fix Suspension Rod
by M10 expansion bolt (not included)
on the ceiling.
Refer to drawing.
3.3
Installtion completed.
* Please consult our authorized service person when you meet any trouble in
installation. We are not liable for any damage or injury caused by mishandling
or improper operation.
INSTALLATION GUIDE
3.2
Lift and insert the assembled Projector
done in step-2.9 into the lower Rod
of the Universal Ceiling Mounting Kit.
Insert the Locking Hook into the cutting
slot and tighten them with M8x50
Socket cap screw and Self-locking nut.
*Specifi cations are subject to changes without notice.
INSERT