- ページ 13

屋外倉庫 Duratuf KL3のPDF 組立説明書をオンラインで閲覧またはダウンロードできます。Duratuf KL3 16 ページ。 Kiwi series

Duratuf KL3 組立説明書
Step 1: Place shed in final position. Check the di-
agonal measurements are the same and
the shed is level before fitting Floor. It is
recommended that the shed is anchored
down with either a Duratuf Bolt Down Kit or
Duratuf Peg Down Kit depending on what
the shed is sited on.
Step 2: Lay a Floor Board on top of Bottom Plates
and Joist and push up against end wall.
Mark out where Studs are. Cut checkouts
with Electric Jigsaw so Floor Board will fit
around Studs.
Step 3: Re-position Floor Board. Lay out remain-
ing Floor Boards checking around Studs
as you go. The last Floor Board may
have to be cut to size.
Step 4: Nail in each Floor Board, two 50mm
nails in each end and two into Joist.
Measure and cut Floor Flashing (110) to
fit in between Door Jamb Flashings and
nail in place using 50mm Clouts.
KL3 FLOOR (Optional)
13