- ページ 8

屋外倉庫 Duratuf KIWI MK2AのPDF 組立説明書をオンラインで閲覧またはダウンロードできます。Duratuf KIWI MK2A 16 ページ。
Duratuf KIWI MK2A にも: 組立説明書 (18 ページ)

Duratuf KIWI MK2A 組立説明書
MK2A LOUVRE WINDOW (Optional)
Step 1: Lay out the two window studs (883mm) and Nog
(634mm) on a flat surface. Position Nog and nail
in place using 2x 75mm nails at each end.
Step 3: Nail wall Sheets to window framing using 30mm
clouts. (return to step 4 on page 7 and com-
plete). Then fit Window Frame). Position Window
Frame centrally on window opening and rivet it to
ribs. Pre-drill holes in each corner and nail Win-
dow Frame to framing, using 50mm nails.
Step 5: Rivet Over Panel to the Window Frame with riv-
ets.
588mm
50mm
NAILS
RIVITS
Step 2: On the inside of the shed, position studs and
Nog centrally on window opening. Make sure the
studs are parallel and nail into Top Plate and
End Wall Nog.
Step 4: If the Window is in the gable end, temporarily
position the Over Panel above Window Frame.
Following the same angle as the gable, mark
and cut to suit.
Step 6: From the inside of the shed, slide Louvre Glass
into Louvre Units attached to the Window Frame.
Bend up tabs to keep Glass in position.
8