CONCRETE FLOOR PEDESTAL INSTALLATION
If the fireplace is being installed over a concrete floor, no pedestal or heat barrier is required for installation. The
fireplace can be installed with the firebox base (step 1 of firebox assembly) directly on the concrete floor, result-
ing in a 5" hearth height. If an elevated opening of more than 5" is desired, follow the instructions for fabricating
a pedestal on page 8.
FLUSH FLOOR INSTALLATION
The base of the firebox (shown in step 1 below) can be omitted completely for a flush floor installation, and in-
stead replaced with a layer of
floor, and firebox installation will start with step 2 of firebox assembly. This results in a
FIREBOX ASSEMBLY PROCEDURE
The Contempo PFM Series Fireplace consists of 9, 10, or 11 modular lightweight pieces (depending on the
model). A Contempo Installation Carriage is available from your dealer if assembling the fireplace in the final po-
sition is not possible. When the Carriage is used, the fireplace will be assembled on the carriage following the
same procedures outlined below, and then moved into the final position using a pallet jack.
The installation procedure that follows, outlines a typical installation with a finished hearth elevation of 13" (8"
pedestal + 5" firebox base).
1. Base Installation
1A: PFM36,PFM42,PFM48 single piece base
1A. Start by spreading a thin layer of supplied fireplace mortar on the pedestal or concrete floor. For models PFM36,
PFM42, and PFM48—set the base on the pedestal and firmly press down spreading the mortar (as shown in 1A).
1B, 1C. For model PFM60 the base will consist of 2 keyed sections (1B) and supplied pre-cut firebrick (1C). Spread a
thin layer of supplied fireplace mortar on the block pedestal, and then set the right base (protruding key section
on bottom) section in place. Place fireplace mortar on the key joint and set the left base section. Next, install the
split firebricks. They have been pre-cut to fit into the base. Beginning with the front row, spread fireplace mortar
on the inside base with a
bricks in a running pattern.
1
The base should be
" in front of the chase, so when
/
2
" thick firebrick. In this case, the firebrick would be mortared to the concrete
1
1
/
4
1B
1
1
/
" x
/
" grooved tile applicator. Place the first brick over the center joint and lay the
4
4
1
PFM60 two piece base with firebrick
" sheetrock is installed it will be flush with the fireplace face.
/
2
9
" finished hearth.
1
1
/
4
1C
Firebrick