- ページ 9

スイッチ 4B Binswitch BS1V6FCのPDF 操作マニュアルをオンラインで閲覧またはダウンロードできます。4B Binswitch BS1V6FC 12 ページ。 Capacitance point level switch

1. Check that the unit is correctly installed (see standard wiring diagram).
2. After going through the sensor calibration steps, the red LED should be "ON".
3. Introduce material to the Binswitch. If calibrated correctly, the Binswitch will activate when material
has been detected. Machinery shut down will depend on your specific monitoring setup. 4B
recommends an instant shutdown when maximum fill level or a plug condition has been detected.
If the system does not immediately shutdown as expected or alarm as required, then remove the
machine from service until the problem has been diagnosed and corrected.
FAULT
Unexpected Operation
False / Inconsistent Readings
Sensor Not Detecting Material

TESTING AND COMMISSIONING

WARNING

TROUBLESHOOTING GUIDE

Re-calibrate sensor, if problem continues contact 4B.
1. Check that sensor is not in the direct flow of material, and
remove from flow if necessary.
2. If sensor is coated in dust, re-calibrate by following calibration
Instructions.
1. If monitoring different types of materials, calibrate the sensor
Sensitivity to the lightest material being monitored.
2. Re-calibrate sensor, if problem continues contact 4B.
REMEDY
PAGE 9