- ページ 6

コントロールユニット APPENDIX SCE 2000のPDF マニュアルをオンラインで閲覧またはダウンロードできます。APPENDIX SCE 2000 8 ページ。 External optical bypass module

Installing the External Bypass Module
Power up the SCE 2000 platform, as explained in
Step 5
Verify that the relevant GBE interfaces of the SCE 2000 platform are now in sync, as the External Optical
Bypass module is now active (in bypass), and is performing a loopback on these interfaces.
Auto-Negotiation should be configured identically for the two SCE 2000 platform GBE interfaces and
the GBE interfaces of the switch/router on either side of the External Optical Bypass module. It is
recommended that the two GBE interfaces of the SCE 2000 platform, as well as the GBE interfaces of
the switch/router on either side of the External Optical Bypass module, be configured to
Auto-Negotiation = OFF
Connect the control cable (supplied in the kit) from the Bypass 9-pin D-Type connector on the rear panel
Step 6
of the SCE 2000 platform to the Control connector on the External Optical Bypass module.
The SCE 2000 platform immediately starts providing power to the External Optical Bypass module, so
the bypass module becomes inactive, and starts transferring the traffic to the SCE 2000 platform. The
"No Bypass " LED should therefore be lit.
Figure A-5
Figure A-5
Subscriber
PWR A
Subscriber
Cisco SCE 2000 4xGBE Installation and Configuration Guide
A-6
displays the external optical bypass module connectivity.
External Optical Bypass Module Connectivity
Switch
GBE
link
PWR B
STATUS
BYPASS
LINK RX TX
RX
MM
SUB
GBE
link
Switch
Appendix A
Basic SCE 2000 Platform Operations, page
External optical
bypass module
Power
GBE
GBE
LINK RX TX
LINK RX TX
TX
RX
MM
TX
RX
MM
GBE-1
LINE
NET
SUB LINE/CASCADE NET
GBE
Power
External optical
bypass module
The External Optical Bypass Module
Switch
Network
Cisco SCE 2000
Series
4xGBE
LINK RX
TX
TX
RX
MM
TX
GBE-2
GBE
Network
Switch
OL-21096-02
7-1.