- ページ 12
ストーブ 509 Fabrication 5095-1のPDF マニュアルをオンラインで閲覧またはダウンロードできます。509 Fabrication 5095-1 13 ページ。 Steelhead camp stove
7. Slide in metal baffle plate through door with slots cut on plate pointing down. Slide
metal plate under gray baffle boards and rest it on the horizontal top bricks and
push it back some.
8. Place the last horizontal brick on the left and right side going under the metal baffle.
9. Slide the metal baffle plate slightly forward towards the door using the cutout on
the sides of the baffle plate as a guide so that the cutout rests on the side bricks as
shown in picture below.
Make sure to check the gray baffle boards placement again. Correctly overlapped in
10.
the center, with no gaps and pushed all the way to the back of the stove.
Place the 4 bottom bricks in the stove.
11.
gray baffle and metal baffle placement inside stove.
Cutout Picture of correct