- ページ 13

ストーブ 509 Fabrication 5095-1のPDF マニュアルをオンラインで閲覧またはダウンロードできます。509 Fabrication 5095-1 13 ページ。 Steelhead camp stove

WINDOW GLASS REPLACEMENT
Breakdown of glass replacement if needed. 10-32 KEPS Nuts
1. Remove all nuts from around the glass.
2. Gently remove all brackets
3. Pull out glass
4. Install new fire-glass channel tape (Meeco 300B ¾") starting in the center of the shorter edge of
the glass and wrap around both sides of the glass evenly placing the center adhesive strip
against the glass edge side. Cut the end of the tape evenly so it
5. Set glass in opening making sure it is straight and evenly set over the opening.
6. Place brackets on blot studs around 4 sides
7. Place a nut on each stud
8. Gently tighten all nuts evenly going around the glass brackets several times.
BURN AT OWNERS RISK. NOT RESPONSIBLE FOR ANY STOVE INSTALLATION
DO NOT OVER TIGHTEN THE NUTS. GLASS WILL BREAK