- ページ 3
セキュリティシステム 2gig Technologies GC3のPDF マニュアルをオンラインで閲覧またはダウンロードできます。2gig Technologies GC3 4 ページ。 Lte cellular radio module
2gig Technologies GC3 にも: クイック・スタート・マニュアル (2 ページ)
INSTALLING the NEW BATTERY
Be careful when handling the battery to avoid
scratching the surface. Scratches on the battery
could render the battery not useable. Contact
Nortek Control Customer Support to assist with
a replacement.
1. Take the new battery, and ease it into the
panel back into position clearing TAB 2 then
sliding the battery under TAB 1.
a. The connection wire should be closest to
the side tab, adjacent from Tab 2.
2. Reattach the wired battery pin connector to
the PCB battery connector port.
b. Tuck the wire and ferrite bead in the channel alongside the battery so it sits below the surface
of the battery.
Tuck Bead
3. Re-attach the THIRD HAND and hang the
panel on the wall
NOTE: SKIP this step if your panel is not
mounted.
4. Re-attach any connectors back to the
terminal block if removed when removing
the panel from the wall.
5. Reconnect Power
a. Re-attach the barrel connector to the
barrel jack on the panel if this power
option is used.
OR
b. Re-attach the 2-conductor power
wires to the PWR+ /PWR- screw
positions on the panel's terminal block.
Be sure the correct wires are aligned
with the proper input positions.
Connector should
be located closest
to this side of
the panel.
IMPORTANT: Be certain that the ferrite bead is
properly seated next to the battery connector
terminal to prevent damage to the battery or the
back panel from closing properly.
Third Hand
8
GND
7
ZONE 2
6
ZONE 1
5
BELL –
BELL +
4
GND
3
2
PWR –
PWR +
1
-OR-
Re-attach the 2-Conductor
Power Wires (if in use)
Connect the
Barrel Power
Connector
(if in use)