- ページ 3
配管製品 Dawn AACT302134-01のPDF インストレーション・マニュアルをオンラインで閲覧またはダウンロードできます。Dawn AACT302134-01 5 ページ。 Vanity
Safety Glasses, Pencil, Level, Tape Measure, Stud Finder, Assorted Screwdrivers, Assorted Wrenches,
Drill, Screw Gun, Caulking Gun, Hammer, Screws, Nail Anchors/Molly Screws
Comply with Plumbing Codes
●
Before installing any Dawn product in your new or remodeled kitchen, you should make sure that you are in compliance with all
local plumbing codes.
Check Product Condi on
●
Before installa on, please check the condi on of the product and, if appropriate, its components. If there is any problem with
the product and/or its components, please contact the store you purchased it from for a replacement. As soon as you have in-
spected your product, please return it to its original packaging un l you are ready to install it.
Handle with Care
●
To protect its finish and avoid damage before and a er installa on, please handle the product with care. For care and cleaning
ps a er installa on, please refer to the Care and Cleaning Guide in this instruc on guide.
IMPORTANT: Recommended for professional installers only. The installer maintains responsibility for installing the product safely.
1. Install the Vanity
Use a stud finder to locate and mark the wall studs.
●
Li and place the vanity cabinet in posi on against the finished wall. Make sure
●
the top is level and the supply valves clear any drawers in the cabinet.
Drill pilot holes through the vanity back and the finished wall. For holes not inline
●
with studs, push or hammer in wall anchors that are made for your wall surface.
Secure the cabinet to the finished wall with screws.
●
2. Install the Countertop
Assemble the faucet and the sink drain to the countertop.
●
Run a bead of silicone adhesive around the top of the vanity cabinet. Place the
●
sink countertop on top of the cabinet and press firmly in place. Let the silicone
adhesive cure.
Connect the water supply lines and the drain.
●
Reinstall the cabinet drawer(s).
●
Apply a bead of caulk along the back edge against the wall. Clean up any excess.
●
Allow 24 hours to dry.
Turn on the water to test for leaks.
●
3. Install the Mirror
Examine the type of brackets on the back of the mirror.
●
Hold the mirror flush and level against the wall in the desired posi on. Mark the
●
mirror's placement with a pencil around the top and bo om corners. Set the
mirror aside with care.
Use a stud finder to locate studs on the wall. Mark the loca on with a pencil.
●
Measure the distance from the top of the mirror to the brackets on the back of
●
the mirror. Use this measurement to mark the posi ons for the screws on the
wall. Make sure the marks are straight with a level.
Drill pilot holes into the marks for the screws . If the screws will not be mounted
●
on studs, hammer in wall anchors.
Insert screws, leaving a short length of screw extending from the wall surface.
●
Hang the mirror.
LEGAL DISCLAIMER:
This instruc on guide is done as a public service to customers of Dawn Kitchen & Bath Products, Inc. ("Dawn"). For special situa ons or further assistance, please consult professionals.
●
All products should be inspected by customers upon receipt and before any installa on. Any defec ve product should be reported immediately and should NOT be installed.
●
Requirements may vary for installa on in a granite, marble, stone, or butcher block countertop.
●
Installa on by professional installers is highly recommended. Dawn assumes no liability for any damages incurred through the use of informa on provided in this guide.
●
MATERIALS & TOOLS
BEFORE YOU BEGIN
INSTALLATION
3
INSTALLATION GUIDE AACS-3001