Dawn AACT302134-01 Kurulum Kılavuzu - Sayfa 3

Sıhhi Tesisat Ürünleri Dawn AACT302134-01 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Dawn AACT302134-01 5 sayfaları. Vanity

Safety Glasses, Pencil, Level, Tape Measure, Stud Finder, Assorted Screwdrivers, Assorted Wrenches,
Drill, Screw Gun, Caulking Gun, Hammer, Screws, Nail Anchors/Molly Screws
Comply with Plumbing Codes
Before installing any Dawn product in your new or remodeled kitchen, you should make sure that you are in compliance with all
local plumbing codes.
Check Product Condi on
Before installa on, please check the condi on of the product and, if appropriate, its components. If there is any problem with
the product and/or its components, please contact the store you purchased it from for a replacement. As soon as you have in-
spected your product, please return it to its original packaging un l you are ready to install it.
Handle with Care
To protect its finish and avoid damage before and a er installa on, please handle the product with care. For care and cleaning
ps a er installa on, please refer to the Care and Cleaning Guide in this instruc on guide.
IMPORTANT: Recommended for professional installers only. The installer maintains responsibility for installing the product safely.
1. Install the Vanity
Use a stud finder to locate and mark the wall studs.
Li and place the vanity cabinet in posi on against the finished wall. Make sure
the top is level and the supply valves clear any drawers in the cabinet.
Drill pilot holes through the vanity back and the finished wall. For holes not inline
with studs, push or hammer in wall anchors that are made for your wall surface.
Secure the cabinet to the finished wall with screws.
2. Install the Countertop
Assemble the faucet and the sink drain to the countertop.
Run a bead of silicone adhesive around the top of the vanity cabinet. Place the
sink countertop on top of the cabinet and press firmly in place. Let the silicone
adhesive cure.
Connect the water supply lines and the drain.
Reinstall the cabinet drawer(s).
Apply a bead of caulk along the back edge against the wall. Clean up any excess.
Allow 24 hours to dry.
Turn on the water to test for leaks.
3. Install the Mirror
Examine the type of brackets on the back of the mirror.
Hold the mirror flush and level against the wall in the desired posi on. Mark the
mirror's placement with a pencil around the top and bo om corners. Set the
mirror aside with care.
Use a stud finder to locate studs on the wall. Mark the loca on with a pencil.
Measure the distance from the top of the mirror to the brackets on the back of
the mirror. Use this measurement to mark the posi ons for the screws on the
wall. Make sure the marks are straight with a level.
Drill pilot holes into the marks for the screws . If the screws will not be mounted
on studs, hammer in wall anchors.
Insert screws, leaving a short length of screw extending from the wall surface.
Hang the mirror.
LEGAL DISCLAIMER:
This instruc on guide is done as a public service to customers of Dawn Kitchen & Bath Products, Inc. ("Dawn"). For special situa ons or further assistance, please consult professionals.
All products should be inspected by customers upon receipt and before any installa on. Any defec ve product should be reported immediately and should NOT be installed.
Requirements may vary for installa on in a granite, marble, stone, or butcher block countertop.
Installa on by professional installers is highly recommended. Dawn assumes no liability for any damages incurred through the use of informa on provided in this guide.
MATERIALS & TOOLS

BEFORE YOU BEGIN

INSTALLATION

3
INSTALLATION GUIDE AACS-3001