- ページ 11
農機具 GREAT PLAINS 1205NTのPDF プレデリバリーマニュアルをオンラインで閲覧またはダウンロードできます。GREAT PLAINS 1205NT 20 ページ。 End wheel no-till drill
GREAT PLAINS 1205NT にも: フィールド調整マニュアル (5 ページ)
Assembly
The following headings are step-by-step instruc-
tions for assembling the 1205NT Drill. Begin with
"Tools Required" and "Pre-Assembly Checklist" to
make sure you have all necessary parts and
equipment. Follow each step to make the job as
quick and safe as possible and produce a properly
working machine.
The 1205NT Drill is shipped via flat bed truck. It is
the dealer's responsibility to unload the new ma-
chine. Unload all equipment before beginning
assembly. Do not attempt any assembly work
while the 1205NT Drill is on the truck.
Tools Required
•
Fork lift, overhead hoist, or loader
•
General hand tools
Pre-Assembly Checklist
1. Before assembling, read and understand "Im-
portant Safety Information," beginning on
page 1.
2. Have at least two people on hand while as-
sembling.
3. Make sure assembly area is level and free of
obstructions (preferably an open concrete ar-
ea).
4. Have all major components.
5. Have all fasteners and pins shipped with the
drill.
IMPORTANT: If a pre-assembled part or fas-
tener is temporarily removed, remember
where it goes. Keep the parts separated.
6. Have a copy of the parts manual on hand. If
unsure of proper placement or use of any part
or fastener, refer to the parts manual.
7. Check that all working parts are moving free-
ly, bolts are tight, and cotter pins are spread.
8. Check for proper tension and alignment on all
drive chains.
3/24/06
Assembly
9
150-131Q