- ページ 2

芝生とガーデン用品 Agriframes 4ft Green Rose ArchのPDF 組み立て説明書をオンラインで閲覧またはダウンロードできます。Agriframes 4ft Green Rose Arch 3 ページ。

Parts List
Assembly Instructions
1. Preparation
1.1. Take four of the 37½" uprights and tap an end plug into the standard end of each.
1.2. Place a screw in each T joint but only tighten the screws enough to hold them in.
Make sure the screw points do not protrude into the inside of the joints as they will
scratch the coating when they are attached to the tubes.
1.3. Take the eight 16¾" spacers. Push T joints onto both ends of all of them. Lay each
assembly flat to ensure the joints are parallel as shown below then measure the
exposed tube and ensure that it is 13 " long. If the measurement is greater than this
you will need to use a rubber mallet to knock the joints home.
2. Assembling the roof section
2.1. Refer to the diagram below. Take the four York curves and three of the 16¾" spacer bar assemblies
from above. Connect each reduced end curve to a standard curve to make two semicircular hoops.
Slide a spacer assembly onto the curves and attach it in the centre of the curves so that it covers the
join. Slide a spacer onto each side of the assembly. Do not attach these spacers; just temporarily slide
them onto the bottoms of the curves.
2.2. Measure the diagonals of the roof section to ensure it is square and adjust if necessary.
Quantity
8
37½" uprights (reduced one end)
2
York curves (plain ends)
2
York curves (reduced one end)
7
1
14
14
4
8
Quantity
Optional Component
4
Lattice panels 4 cells high x 3 cells wide
24
Components
16¾" spacer bars
Holemaker
T joints
Screws
" end plugs
" moisture seals
Lattice ties
13 "