- ページ 9
デスクトップ AFFIX MADW-AGR SeriesのPDF 組立マニュアルをオンラインで閲覧またはダウンロードできます。AFFIX MADW-AGR Series 20 ページ。 Aluminium double width mobile towers
ASSEMBLY
08
Step 5
Step 5.1
Step 5.1
Hook the top rung of the AGR frame to
the top rung of the 2nd level frames and
the bottom rung of the AGR frame should
be hooked to the 1st rung of the 2nd level
frames.
Step 5.2
Repeat Step 5.1 for the opposite side but
slide it towards the frame ladders to
provide cover to the platform.
Step 6
Clamp the 4 Stabilizers on all 4 corners
as per the Components Table on Page
no. 17. For detailed instructions on
installation refer to Page no.15.